Image
Excavating the broken and unstable rock in the access tunnel was slow and difficult work. The bare rock had to be covered with steel mesh and then sprayed with concrete.
Credit
© Nimmo Photography
Permission of Nimmo Photography must be obtained before any re-use of this image.